返回首页

澳大利亚RMIT大学business letter assignment写作要求:report格式

时间:2012-11-22 16:46来源:www.ukthesis.org 作者:英国论文网 点击联系客服: 客服:Damien

INTE2043:硬件和操作系统
定义1:商业系统推荐
版本G
这个任务是可以完成的组(同一组,你在实验室工作)。
请你写一份报告(report),详细的一个主要议题已处理的硬件和操作系统+主题
到期日(星期五)在第6周 - 第27
2010年8月。
提交格式在线提交。每个小组提交的分配,作为一个Microsoft Word文档为可移植文档格式(PDF)文件。提交作品,可以使用Turnitin检查内容的真实性在RMIT

 

INTE2043: Hardware and Operating Systems
Assignment 1: Business Systems Recommendation
Version G
This assignment is to be completed by groups (the same groups that you work with in laboratories).
+Topic You are to write a report detailing a major topic which has been dealt with in Hardware and Operating Systems
Date due Friday of week 6 – 27th
 

下午5:00的到期date.The名称的文件将提交给组的文件RMIT在线提交procedureEach分配应在以下格式:
Assignment_2_xxxxxx.doc或Assignment_2_xxxxxx.pdf
其中XXXXXX是该组的名称。
不服从freddo.bf.rmit.edu.auRequired长度分配提交应该处理的主题,充分不再有足够的长度。在任何情况下,转让应不再超过2000 words.Late提交的逾期递交将收到的最大的及格等级的。如果你想获得信贷,区分或区分等级高,你必须有你的工作时间。
硬件和操作系统

 

August 2010.
Submission format On-line submission.  Each group is to submit the assignment as a Microsoft Word document or as a Portable Document Format (PDF) file.  Submitted work may be checked for authenticity using TurnItIn at RMIT(http://turnitin.com/static/home.html )
Submission procedureEach assignment is to be submitted to the group's file area on RMIT On-line by 5:00PM on the due date.The name of the file should be in the following format:
Assignment_2_xxxxxx.doc or Assignment_2_xxxxxx.pdf
Where xxxxxx is the name of the group.
Do not submit to freddo.bf.rmit.edu.auRequired length Assignment submissions should be of sufficient length to deal with the topic adequately and no longer.  In any case, the assignment should be no longer than 2000 words.Late submissions Late submissions will receive a maximum grade of pass.  If you want to earn a credit, distinction or high distinction grade you must have your work in on time.
Hardware & Operating Systems
GROUP ASSIGNMENT
Your Task:
"Australian Institute of Technology (AIT)" has had a big increase in the number of student intake in recent years. AIT operates several campuses, all in very close proximity.  AIT's IT operational management has decided to upgrade their existing computer labs as well as overhaul of their existing hybrid system of Novell, Linux, and Windows networks. Their current servers are Compaq Proliant 800 servers with Pentium II 400, 256MB RAM, and 40GB of hard disks each.It is anticipated that by the end of the project AIT will have a hybrid network of Windows XP and Windows Vista Professional workstations (责任编辑:charlie)



------分隔符-------------------------------------
UK Thesis Base Contacts
推荐内容

Europe (24-hours)
EN:13917206902
china (24-hours)
CN:13917206902
在线客服团队
全天候24小时在线客服 QQ:923678151

微信在线客服(24小时)

微信公众订阅号